SVG New Port – Piling
Client: Aecon
2023-2024
Techniques: King piling, sheetpile infills, sheetpile wall, anchor wall, anchor rods
Currently in progress. Intrepid’s 2nd port project. Working as a sub contractor to AECON/Eiffage. Intrepid is handling the entire piling for this project. King piles, 30m long, 1.4m diameter, 25mm wall thickness. Intrepid used a CAPE Holland VLT vibratory hammer to pitch the piles. This hammer is a certified lifting tool so Intrepid was able to make significant time savings on the pitching of the piles. A IHC S200 was required to drive the tubular piles to level.